I will
check how well the ballast dried later during the week and may give all the
areas another soaking of watered down white glue.
I also
spent some more time trying to affix the roof to my FAM coach. The plan is make it removable. I have now super glued three nuts to the roof of the FAM and
it appears that the bolts that comer up from the under the floor do screw into the nuts. I will let the super
glue cure and give everything a final try mid week. I will then look at
fitting the end diaphrams and the windows to the coach. Then I will need to fit couplers
and decal the coach. It can then be allocated to one of my passenger
trains. That reminds me that I need to adjust the train consists of both
my passenger trains as I have my Brisbane Limited sleepers from Auscision to
take for a trial run and then put into service permanently.
I am also
looking at fitting the railings to the industrial fencing around the Rocla
Sleeper Siding. Following this, the chain wire will also be fitted.
I will also add some signs to the front of the complex and then add some sort
of buildings and a travelling crane to the worksite.
Next on the
list of things to finish is some more detail to Baker’s Farm. This is
located on the left as you enter the shed and is on the road to the Rocla
Sleeper Siding. I painted up some more white metal post and rail fencing
today and will fit that next Sunday. There a few things to fit in the farm. There is some more fencing down the other end of the farm and the hen house will need to be built and chickens fitted. There are also some internal fences to be added to the farm and a few fruit frees and maybe some vegetable gardens. I purchased some crows and pigs while down at Armidale, so I think it is likely that these will also get a run somewhere in the farm.
I am also
trying to work up some courage and get out my No More Gaps again to resume work on another batch of trees. I have about 40
trees I have at the armature stage and need to be thickened up with No More Gaps. They will
then be painted and sometime over the Christmas Holidays I will glue leaves on
these trees. I have about 20 that are weeping willows that a few of my
creeks around the layout need to be decorated with.
I am also
thinking that I need to put a few puddles around the layout – next to some
roads, in the middle of a field, etc. I may also put some water in a
couple of swampy areas near Bonalbo Ballast Siding and between Richmond River
Bridge and Cassino Station. These are relatively small projects but I’m
sure the guys attending my next Operating Session in December will certainly be
impressed by this progress.
No comments:
Post a Comment