Sunday, July 28, 2019

I Think I Made My First Point Very Well


This week I had not been to the shed until late this morning.  While I was planning to try and check the scratch built points electrically before I installed then in the layout, I was too lazy to wire them up.  So I bit the bullet and installed one of the dual gauge points in the northern lead into Acacia Ridge Yard.  I trimmed the rails so it matched the size of the point I was replacing and basically it slipped right into the space provided.  I installed a double pole double throw electrical switch in the baseboard to actuate the point by an omega spring made from a paper clip.  I used the switch to control the polarity to the frog of the dual gauge point.  After installation I turned the layout power on and there were no shorts.  I ran my 45 class, an AR Kits loco that I installed a decoder in about 10 years ago numbered 4519 which was sitting in the standard gauge siding where this dual gauge point connects to.  The loco was driven out of the standard gauge siding and it ran well out onto the mainline.  I then switched the point via the electrical switch and omega spring and the 45 class ran well back through on the mainline.  I then ran the 45 class back the other way and then back into the siding and the standard gauge trains have never run so smoothly through this set of points.  Next test was a 1720 12mm class loco.  1741 was then run through the point backwards and forwards and it ran well through the point as well.  I then took my new wheat wagons for a run, hauled by the 1720 class loco.  They also ran through the point pretty well.  I could not have hoped for a better result.

I decided to push my luck and started removing the other point I was to replace with a new scratch built dual gauge point into Rocklea Sidings for the standard gauge trains.  That was easy and I then cut the dual gauge point for this location to the correct size and installed it.  The standard gauge entry into the Rocklea Sidings seemed to work pretty well.  I then made another omega spring from another paperclip and connected that up to the original point motor.  I then pushed some 12mm wagons that were sitting in Rocklea Sidings through the mainline trackage of the new point and they also seemed to work.  So it seems that the trains pushed through this set of points seem to work quite well.  But I ran out of time to fire up the DCC system and see if there was any shorts with the new point and if powered locos will travel through the points.  I think I will now leave that task until Friday this week. 

All in all a positive result for the few hours I spent in the shed today.

Sunday, July 21, 2019

I Have Some Points to Make


This week on Tuesday night we visited Lefty and Son’s place just up the road in the next Suburb.  There was about 8 or 9 of us there if my memory serves me correctly.  PK was supposed to attend, but his car suffered a fit just outside the PA hospital.  Apparently the good folk from the RACQ got him and his old almost 25 year old car home, and an auto electrician was able to do some sort of transplant surgery on the old Camry and the damn thing might still have another 20 years of life left in it.  That is probably how long it will take for him to get around to installing his Clothesline in the back yard, so he can then insulate and line his shed, as a prelude to building his HO and N scale empires inside.

So Lefty has been given some offers of help to install some wall brackets that will allow a roof to be provided to his top deck on the layout.  This will assist in keeping dust and other particulates from the layout and provide a base to mount his overhead LED lights onto.  We await his call to arms to provide assistance.

PK was going to drop off his Fast Tracks dual gauge jig on Tuesday night, so his non-show was jeopardising me building some dual gauge points this weekend.  But PK did come to the rescue when he rocked up at work for a coffee early on Thursday and handed over his fast Tracks jig, so my plans could go ahead.

I was able to sneak over to Austral Modelcraft on Saturday morning before soccer and picked up two lengths of code 83 rail so I could spend this afternoon in the shed making two dual gauge points.  I had already cut the PC board sleepers last weekend.  So today was just cutting the insulation joints on the PC board sleepers between the two rails, then slowly measuring, cutting to length and grinding the various shapes of the rail lengths in the points.  These were then soldered up and various pairs of HO and HOn3 1/2 bogies were run through them.  Once complete I installed a throw bar.  The points seem to work.  Hopefully I will get around to looking at installing this set of points into the entry to Rocklea Sidings next weekend.

So after completing the first sets of points, I then thought about starting the second.  A quick scan of my supply of PC board sleeper strip material revealed that I had one length left in the packet hanging on my workbench.  That was not going to be enough.  I then went to the location where I left my last few point building projects and found another length of PC board strip along with another half a length.  Well that was just enough.

So the PC board sleepers were cut off, the rails cut to lengths, and eventually everything was soldered up and this point also seems to work.  Although the actuating throw bar was giving me some trouble, it has been added and this one set of points also seems to work.  This set of points is due to the lead into Acacia Ridge yard from the Clapham Yard end.  It provides a small HO loco storage siding at this location.

My first task next weekend, will be to put both of these points on a small test track and ensure that they are correctly electrically isolated, before I put them on the layout.

Sunday, July 14, 2019

Still Stuffing Round with Rocklea Sidings


I had Friday off work this week and spent some time in the afternoon down the shed.  I ripped up the dual gauge track between Clapham Yard and Rocklea Sidings with the intention of relaying this section.  I had a narrow gauge curve point in this section to allow narrow gauge trains to gain entry to Rocklea Sidings.  This narrow gauge curve point had a third rail laid on the outside to form the standard gauge track in this section.  This was always causing some issues.  The reason was that the third rail on the outside was not exactly 16.5mm from the far rail on the inside of narrow gauge point.

So after lunch I ripped up the track and then took to the baseboard with a Dremel with a sanding disk in it.  This was to take a bit of a bulge out of the baseboard at this location and ensure a smooth base to work from.  This had the desired effect.  I then stole one of the points allocated to Fisherman Islands Yard for a narrow gauge cross over and installed that point in the track narrow gauge main line at Clapham Yard that merges with the standard gauge track from Clapham Yard to form the dual gauge via a Tillig gauge splitter piece of track.  I had to add about an inch onto the baseboard at this location first to allo wteh extra track to co exists with the dual track mainline.  So it made a longer narrow gauge lead into the Rocklea Sidings but this now runs very well.  The dual gauge main line track also runs better until it gets to the current dual gauge point that splits off the standard gauge into the Rocklea Sidings Complex.  I have not reconnected the point motor for the standard gauge sidings so I cannot run trains through it.  I did however, relocate the point motor from the old narrow gauge curve point, by extending the three wires to the Peco point motor to the new location of the point motor.  This relocated point and point motor now works very well.

I am once again contemplating scratch building two new dual gauge points for two locations on the layout to replace two others currently in use.  One is a bastardised Peco HO point, that I ran the third narrow gauge rail through.  I feel I can now build a better version of this point.  I think I will need to purchase a couple of lengths of code 83 rail this coming weekend and have to borrow PK’s dual gauge Fast Tracks point jig.  I’ve had one of his jigs for months, but I need it to use it to build one of these points, and I will need to borrow the other jig to build one point of the other hand, with the third rail on the other side of the point.

Let’s see how I go over the next two weeks or so working on that task.

Sunday, July 7, 2019

Trip from Toowoomba to Fisherman Islands

I was extremely fortunate to be offered a cab ride last Monday from Toowoomba to Fisherman Islands on an Aurizon coalie.  It all started at my place when I was picked up and transported to Willowburn Yard to sign in and do a breathalyser test.  Of course I registered 0.00% so I could take my place in the car out to the Harlaxton Ballast Quarry with the crew for a change over.  My crew were great.  They even knew some of the old folks that I know from QR, QR National and Aurizon.

We had a slow trip down the range not exceeding 20km/h, passing many empties on the way back up to the mine.  Our first crossing loop was Rangeview reached at 12:01pm.  At Springbluff we crossed out first empty 9616 with 2305 + 2346 in charge at about 12:42pm.  There were lots of people on the platform, maybe due to school holidays.

We then crossed 2348 + 2350 on 9618 at 1:48pm through Lockyer.  This was followed by 2328 + 2313 on 9620 at 2:00pm at Helidon.  At Helidon the detector told us that we were 692m in length and had 44 Vehicles (of course two were the locos).  

At Gatton we passed 2388 + 2333 on 9624.  We were held outside Ipswich awaiting for an electric to get in front of us, and we passed 2306 + 23?? at Booval.

There was a cattle train in the cattle siding at Dinmore hauled by 2365 + 2390.  We had green lights all the way from Ipswich until arrival at the Fuel loading point at Fisherman Islands at 5:16pm.  We left provisioning at 5:46pm and basically my day was then complete. Our train was lead by 2320 and wouldn't you know it, I never got the other 2300's number. 

What a day!  We passed many electrics once we got into the suburban area.  A couple of places you could just look at the track and see that there was a bit of a wobble coming up and then sure enough as we went over that section, we got a good shake.  I got to see some unusual QR signal aspects, and could listen to the various announcements over the radio.  Some were quite interesting when we were in the Brisbane suburban area.

Thank you to those that helped to arrange the days events.  I had an absolute blast.

I think this is leaving Rangeview Loop.

About to enter Springbluff

Through Springbluff platform.

Murphy's Creek and an old water tank.

Cross just short of Lockyer

Another cross near Helidon

Our crew change point.

Through a Tunnel.  There were many.

Entering Brisbane Traffic Control territory.

The NGR homebase.

The signal that we had to wait for outside Ipswich.  Ipswich Railway Workshops are off to the left.

Bundamba and the branch is coming in from the right.

Dinmore passing a cattle train and an electric.

Redbank.

Wacol - just for Bob.

Another shot of Wacol.

And another shot of Wacol.

Just west of Darra.  This is advising us that we are taking the freight bypass track.

Just short of the Springfield junction and our destination is the freight bypass track.

Through Darra on that bypass track.

You are about to loose the overhead if you are an electric.

Corinda, my old stomping ground from 30 years ago.

About to cross over to the main.

Crossing over to the main.

Tennyson just before Yeerongpilly.

Joining the dual gauge at Yeerongpilly.

Up over the flyover at Dutton Park and Park Road

Through Coorparoo.  Another famous layout.

Sunday, June 30, 2019

Still Working on the QR WHE Wheat Wagons


Well my 3 week stint at being the A/Director Technology Services at work has come to an end.  OMG!  I am certainly glad that has occurred.  I did enjoy certain bits of it, but it was certainly no easy run.  Anyway, I’m now on holidays for a week to recover.  

Thursday this week I had a pre-arranged day off work, as my daughter had her school formal on that evening.  I had to make myself look presentable in the morning with a visit to Tim’s Barber Shop for a  cut and a natter.  That was followed by washing the car with my son, who was already on school holidays.  The car was the delivery vehicle for the afternoon and evenings activities.  This was followed by a visit to George’s shop to pick up some paint.  While there I found that his daughter was also going to my daughter’s formal as she was the best friend  of another girl in my daughter’s class.  There was only about 4 or 5 boys attending this formal.  I picked up some QR wagon grey colour spray paint and headed back home.  Mid-afternoon, we had to then pick up the daughter’s partner for the night who also attended the same primary school, and take them to the Pre-formal get together, then go to the formal and get some photos with the family and eat a few canapes before retiring and letting the girls and their partners dance the night away.

My first model railway task for the weekend on Saturday was to make use of the can of spray paint that I collected on Thursday when I visited Aurora Trains.  I gave my three scratch built WHE wheat wagons an outside spray. 

It was then time to head out to soccer with my son.  His team was absolutely crunched by the opposition, who were older and bigger.  The score was 8-1.  At least the 1 was scored by my son, with a cracker of a goal from outside the box to the top left of the goal giving the goalkeeper no chance.  He almost had a few more chances, but the bigger opposition, just pushed them around.

So when I got home, I gave the wagons a second coat of QR grey spray paint.  I then completed some work with the Clapham Yard southern end control panel and head phone plug in point.  I moved both so they are more accessible to be under the new extended Acacia Ridge Narrow Gauge Yard.  I finally got around to searching my collection of narrow gauge bogies, and I found out I had 5 pairs of bogies that would be suitable to go under my scratch build WHE wagons.  So maybe I might think about scratch building another 2 wagons.

The next task was to paint the wheels of a PGC WHE wagon I got from Southern Models at the Brisbane Model Train Show.  I then added them to the PGC WHE kit and assembled 7 KD couplers and added two to this wagon.  Later that night I added the wheels and couplers to my scratch built wagons.  So that part of the assembly process it now complete.  I just need to make up a selection of tarpaulin supports for the PGC WHE and my three scratch built ones.

I was tossing up how I will add the tarpaulin for these wagons.  I was going to use two of my teabag tarps.  But I do not like a join or tarps in a wagon.  Today I went to the local Daiso store and picked up a packet of tea bag material for $2.80.  One had 20 tea bags in it and I could cut these out and they would fit my WHE wagons in a single sheet.  So I painted up 4 Daiso tea bag tarps and let them dry.  At that point I started to work on the tarpaulin supports for the wagons.  I remembered that the PGC WHE wagon had an etched brass fret that had 7 tarpaulin supports.  So I cut them out and then drilled 14 x 0.6mm holes with my pin vice drill for the tarp supports to be placed into.  I then cut out 24 tarpaulin supports from 1mm styrene for my scratch built wagons.  These will sit inside the wagon and support the tea bag tarps.  I used the brass fret as a template to draw on my styrene supports, and then I used my cheap Aldi grinding wheel to put the taper on the styrene supports, as per the line I just drew.  

I then double checked the coupler heights on these wagons and how well the wheels rolled on my 4 WHE wagons.  I added some KD washers under the wagons so the wheels did not rub on the underside of the wagon.  I added some lead weight to the inside of the wagons and the seem to track quite well.  I think I will wait until Tuesday to actually give then a run behind a loco from Acacia Ridge Yard to Fisherman Islands Yard.  I’m kind of busy tomorrow.  More on that later this week in another post.

My only concern now is that the tarpaulin material after it has been painted and allowed to dry, is quite thin and could potentially be seen through.  It kind of defeats the purpose of having a tarpaulin that you can see through over a wheat load – doesn’t it?  So I might have to use two tarps one over the other, or even give it another spray of paint from the other side.  So another job for Tuesday.

Sunday, June 23, 2019

Punching Out Some WHE Wagons


This week we visited Dr Peter’s place on Tuesday night for our fortnightly Tuesday Nighter's get together.  I think there was about 10 of us checking out the start of changes on his fantastically detailed layout.  Basically he removed his old loco area, in particular his old turntable and engine roundhouse and built a mountain where underneath it, two tracks are hidden for two coal trains.  Maybe a loads and empties arrangement.  The changes are coming along very nicely.  

My next episode of model trains for the week, was basically yesterday checking out the hundred of photos and posts from the Diesel Era Modelling Facebook Group’s get together yesterday in Sydney.  It was a bit far and expensive for me to travel to this get together, to just run a train, but in the future I hope to get to one of these sessions, as do a few of my Queensland mates.

Today the modelling juices were sufficiently flowing to prompt me to do some further work on three scratch built WHE wagons.  So at the moment I continued to add the stamped ‘X’ panel shape on all the side panels and doors.  I did two complete wagons and more than three quarters to finish off the third wagon which I started back in early May.  I tried doing this modelling work on the kitchen table, but the lighting there was not sufficient for me to see what I was doing with these styrene 'X's.  So I took my portable worktop down to the shed and sat at my modelling desk down there, put the radio on and turned on my LED light above the workbench.  Now I could see.   So once this ‘X’ work was done, I packed up and went up stairs and had a beer.  

My next plan is to head off to a hobby shop next weekend and maybe get some paint for these wagons.  I may be able to spray them next Sunday.  One thing I have not checked out as yet is if I have any suitable bogies available.  I must get them out and check what I have.  It has just dawned on me that I have Thursday off next week.  Maybe after I get my hair cut, I might be able to nick off down to the hobby shop then.  That leaves my Saturday free for other activities soccer related - between goal setup, soccer game, and goal put down, it is already pretty busy.

Go Queensland!

Sunday, June 16, 2019

Doing Some Maintenance

Well this weekend was a nice relaxing one in terms of not spending the weekend doing anything work related.  Although I had about a 20-30 SMS exchange with one of my new staff members from work yesterday, but that was associated with any stress.  Yesterday we again attended two soccer games.  The first for school, ended well.  Kyle scored the first and third goals in the first half and set up one other in the first half with a nice back heel and another in the second half with a great cross.  So the school soccer season is now ended with that 7-3 result.  The afternoon Club game was against a team of rough country bumpkins who were about 30cm taller than our guys.  They were the top team and had been blowing everyone off the park.  The score was 2-0.  Our keeper played like superman.  It was a fantastic game.  Maybe the corner has now been turned and they will start to be more competitive for the second sound of games.  I’m sure they will have a win or two in the rest of the season.

So onto the topic of what this Blog is all about.  Today I went to the shed in the later morning to run my steel train sequence.  That was 6 trains in order. 

Sequence  Train  Train name                     Depart   Arrive   Departs            Arrives
No.               No.                                            Time    Time
5                    8      Up Steel Train                  1:20    5:10    Acacia Ridge    Grafton 
16                 65     Dn Rocklea Steel Shunt   4:00    4:15    Acacia Ridge    Rocklea 
33                 66     Up Rocklea Steel Shunt   8:00    8:15    Rocklea            Acacia Ridge 
83                  7       Down Steel Train            17:00   17:50  Grafton             Cassino 
90                  7A    Down Steel train              19:00   21:00  Cassino            Acacia Ridge
102              70      Acacia Ridge Steel Shunt 22:00  22:45  Acacia Ridge        

So I started off running my empty steel train back toward Grafton Yard, it was evident that the first issue was that the train could not leave the Acacia Ridge Yard.  One set of points was against the train.  It turned out that the wire on the Acacia Ridge Control Panel for track two (where the steel train was) had come adrift.  Thus I could not throw that point.  Sure, I can call up the address of each point motor individually and throw them, but I could not find my manual list of point addresses.  So I can fix that loose wire pretty easily.  Once past that location, the locos stopped dead trying to exit the yard towards Glenapp Loop.  So the next problem solving action revealed that the new baseboard for the Acacia Ridge Narrow Gauge Yard extension from the last few weeks, has impacted on a Peco point motor using a Peco baseplate.  So the point would not throw in one direction, thus no power was provided up to the points that fan out for the yard exit tracks.  So I cut about 2mm of wood away from where the point motor base was, and the point was now able to go back into its position and it could then throw in both directions just like a bought one.  So the steel train could finally depart south.  However, the steel train was having running issues.  Three couplers on various wagons were playing up.  The train was continually separating.  I’d couple it back up and it would then separate at another location in the train.  Very frustrating.  So one by one, the troublesome wagons were removed, taken to the workbench and checked out.  One KD on one wagon had lost its KD spring and its jaws were not shutting.  A new spring was adder and that was not working.  Another troublesome coupler came good after a few manipulations of the jaws.  I think some sort of dust or dirt had got into the spring.  So that was removed and it was all OK as well.  The third wagon had recently had a bogie screw replaced.  But not too well.  The wagon was now too high at one end.  So I removed a couple of KD washers from under the bogie and it is now back to normal and not too high.  So normal services soon resumed.

The train ran quite well from that point on.  I did have some issues with the entry into Rocklea Sidings for the Steel Shunt Train, but after some slight adjustments and packing, everything was then working well again. 

All this occurred while it started to rain outside the shed, and a storm came over.  Not good weekend weather, but I didn’t get wet.

This week is Tuesday Nighters and I have no idea where we are meeting.  Maybe I need to pay more attention at the meetings.  I’m sure someone will tell me before Tuesday Night.