Sunday, February 23, 2014

A Visit to See Mike

Yesterday five of the Tuesday Nighters met at Geoff’s place, where Darren was going to drive all of us along with his trailer to visit Mike.  Darren had a trailer full of Mike’s model railway equipment that I think he has been having withdrawal symptoms about.  Mike has recently relocated to Toowoomba to be closer to his daughter’s place.  So after a 90 minute or so drive we arrived at Mike’s very nice retirement village unit.  Soon after we got there, Mike’s Son-in-law arrived and then we were met with fellow past-Tuesday Nighter, Tess, who relocated to Toowoomba about 4-5 years earlier.  What a great time we had.  We unpacking the trailer, carrying everything into the garage and setting up his two shunting layouts, soring out the stuff, putting some of it away, moving thing here, relocating them to there so we made the most efficient use of his single car garage, which also had his workbench already installed as well as a very nicely laid out set of storage shelves.  Once everything was in its place, we even got one of Mike's layouts running by installing his NCE Power Cab and installed a toggle switch so the layout can be switched to DC operation for Mike’s older locos.  I think Mike was quite happy by us all turning up and also doing the work that we did.
 
Mike decided that he did not need his coloured sands and dirts and was generous enough to donate this to a very deserving cause – me.  I had previously used quite a lot of Mike’s sands and dirts scenicing the various locations on Cassino and I was certainly getting down in a number of the colours.  Well now I have an six ice-cream buckets full.  Brilliant!  I think that might see me through for the rest of the areas that I need to install the base colour over.
 
Following the approximate four hours of work (well we did have a cuppa and cake before we started)we adjourned to the local Golf Club for a very late lunch.  Boy was that a very nice establishment. 
 
Today I decided to spend some time on my side fence which was starting to fall over.  I started clearing the earth around one post and sure enough, it had rotted away just below ground level - it was just suspended in mid air.  So I spent the morning digging out the concrete around the base of what previous was joined to the post, so I have hole to put the new post into.  I think next weekend I will remove the existing magic floating fence post that is currently sitting in mid air, and put in my new fence post (luckily I have three in the garage) and throw a bag of postcrete into the hole and then attach the fence rails to the new post.  I then will have two more posts to investigate over the coming weekends but I believe the same has happened to them.  The fence is about 21 years old.  It is in good condition, just three posts look like they have rotted below ground.  I won't work too fast on this project as it will take time away from my shed.
 
After my morning labouring efforts, I was not in a mood to go to the shed until well after four this arvo.  So I caught up on some recorded TV from during the week.  When I did get to the shed, I did mix up two small batches of plaster and plastered around the concrete path on the north-eastern side of the Bruxner Highway.  I also spread some plaster near my gutter.  I will have to spread another two plaster mixes for that north-east corner, before I work on the other three sides of the road/rail interchange.
 
See ya next week.

Sunday, February 16, 2014

A Day with MERG

Today was a get together day with a number of interested people to gather for the first MERG meeting in Brisbane.  I was invited by a workmate and fellow club member and MERG member Greg, whom also attended.  There were two other members from our Club in attendance as well. I also new about a half dozen others that were there as well.

The day was at the Banyo Library meeting room and started with arrivals from 9:00am for a 9:30am start.  We were very lucky to have a presentation by Davy Dick who was out here from Scotland on a one month holiday.   Davy is the technical person behind a lot of Pocket Money Projects that the MERG organisation publish in their quarterly journal. 

The presentation was on forms of detection, in both DC and DCC.  It covered quite a few from the very simple to the very complex, i.e. RFID and barcodes.  My layout is quite complex now with truck loads of wire and it certainly doesn't need RFID or barcode detectors installed.  However, I do need to incorporate some forms of detection in the near future for a number of level crossings.  There will be about three (3) that I think will be operated by some form of track detection.

Davy's presentation was a very informative meeting with plenty of input from the approximately 30 people present.  There were also plenty of humorous outbursts during the presentation.  Following the presentation we had what could be called the inaugural meeting of the South East Queensland Chapter of MERG.  A few people were elected to various positions and a basic outline of when meetings will occur was agreed at a high level.  There was also agreement that there will be a few basic training sessions for attendees initially followed by other types of presentations.

I think I will be logging onto the MERG website and joining the organisation in the next few weeks when I get around to it.

Later in the afternoon, I thought about heading to the shed but it was just too hot to get motivated.  maybe next week.  Tuesday night happens to be meeting night at my place.  I hope it is not going to be too hot.

Sunday, February 9, 2014

Paving the Road Ahead

On Tuesday this week we had Tuesday Nighters.  It was a held at Lefty and Raymond’s which luckily is just down the road.  Boy was it a full house!  We got to check out the work that Lefty and Raymond had done on the central peninsula.  Next meeting will be at my place.  Now that will create a new definition of squeezy!
 
Yesterday was the monthly Club day.  But on Tuesday night, Darren advised that he was having a modelling day at his place on Tuesday afternoon into the early evening.  Damn!  Well I went to the Club via my mate David's house where I identified some wires that I had left for him to connect up to his Digitrax DS64 the previous weekend.  David got confused with my instructions, so hopefully we are all clear now.  I made it to the Club for the appointed time when the HO'ers get together and discuss the new Clubroom layout.  Kevin (the HO layout Co-ordinator) and his team had created the first control panel and had taped a sample track diagram to it.  It is coming along just nice.  The layout crew is busily wiring the various droppers to the track bus that they are laying.  It won't be long until we can run a train.
 
Soon after the official meeting, I hit the road.  This was a quick almost 50km drive back home and then back on the road again for another 33km to Darren's place.  I got there late and only spent a couple of hours talking, but there was great company.  I noticed that Darren had implemented his form of "Staff Working" for his single line branch.  It used a miniature light switch and a volt meter that has had its face modified and it shows either Line Free or Track on Track.  It does this my him having a battery power supply that gets tuned on by the switch producing the movement in the meter - I mean staff machine.  Pretty damn good!  Darren has also finished his track laying from his last station and into the hidden staging that represents the rest of NSW.
 
Today just after lunch I went over to Lefty and Raymond's and took my RB02 over for a test.  Their RB02 is the original version.  Mine has been upgraded to version 2.1.  I wanted to see if it made their CAB06, when in radio mode, respond quicker as it is supposed to.  Basically we could not determine much difference.  However, I think the key presses were better and you did not have to do slow deliberate presses like the older version.  I know I certainly can see the difference with the RB02 version 2.1 on my layout.
 
Upon return home I then went down to the shed and did some work on the Bruxner Highway level crossing.  I have installed the bitumen roads.  I have installed (glued down) half of the line markings on the road.  I just have to glue the rest down when I am happy with their locations.  I have installed the gutter to the right hand side of the road from the side street around to the end of the road.  I have installed the concrete path from the far side of the roadway that wonders off to the right.  I have also positioned some styrene channel (representing a drain) that will be located between the concrete pathway and the roadway that is going off on the right hand side in an arc between the channel/drain and the existing bitumen road.  This roadway will become a dirt road from where the bitumen stops.  I will also put some angle parking car parks on the road outside a caravan park.
 
Next week I have activities on the Saturday (at the kid's School for the welcome BBQ for the new Prep students) and Sunday (for a potential MERG presentation from one of the UK's high ranking officials).  So I don't think I will get to the shed.  It may be a few weeks before I do any more work like plaster the ground contours and the subsequent colouring of the ground.
 
See ya next week!

Sunday, February 2, 2014

Roadways and Scenery

Last Monday I got stuck into some work in the shed.  I decided to join the baseboard of the extreme top track baseboard that spans from above the top deck of Acacia Ridge to Clapham Yard, to the lower baseboard almost directly below which is the second level of the baseboards that spans from Acacia Ridge to Glenapp Loop.  Previously the extreme top deck was resting on the lower baseboard propped up by blocks of wood.  So now it has been permanently screwed to risers.  I then added a backboard to the top baseboard from Acacia Ridge Yard to Clapham Yard.  This will stop a train falling off the back of the baseboard.  I then installed a backboard for the track from Acacia Ridge to Glenapp Loop. 
A view of the two levels of track.  The top one heads into Clapham Yard.  The one below is the link from Acacia Ridge Yard to Glenapp Loop.  I can gain access to the area behind the track at this location.

Looking towards Clapham yard and Glenapp Loop.  This shows the height separation of these two levels of the layout.

The other end of this area.  Acacia Ridge Yard in the foreground, and the track that climbs toward Clapham Yard in the background.

On the main deck directly below this location, in the locality just past Rappville Loop we have the Bruxner Highway level crossing and around the back of the Bonalbo Ballast Siding, I also installed a backboard around this section.
 
This view shows the backboard from Rappville Loop to behind Bonalbo Ballast Siding on the right.
 
Construction then turned to the 'blob' that allows the train to travel from Lismore around a spiral and into Murwillumbah.  I added two backboards on two sides of the this 'blob'.  I then added a facia to the layout front on the rear of that blob.  I then got stuck into the plastering. 
 
The new facia is in the foreground.  The background shows the two sides of the backboard that was also installed.  An overview of some of the plaster work undertaken is also visible.
 
I mixed a few batches of plaster and then added a few layers of plaster over some styrofoam that I was using to build up the embankments of a dam that will be located in the scenery here.  I also tried to blend in some styrene here with plaster over the top.  I also mixed up a couple of alfoil rock walls with plaster and added then to some foam uprights to make them loop mountainy near some tunnel portals.
A closer up view.  Here you can see the dam starting to take shape.  The backboards have certainly made this area dark.  I will need those LED lighting strips in this area for sure.

On the front side of the blob, the entry into one of the tunnels is starting to take shape.

This shows the inner circuit of the track in the blob from Lismore to Murwillumbah.  An overbridge will eventually be built here with some rock walls on the left hand side of this cutting.

Wednesday this week was the first day back at school and I ended up heading off early as my daughter also resumed here dancing class.  As this was going to necessitate that my wife was going to be away for close to two hours, I went home early to look after my son and prevent him being inflicted with two hours of dancing.  Late in the afternoon, I went down to the shed and mixed up another plaster mix and applied it to the area that I’m working on.
 
I then thought I would do some planning of the area around the Bruxner Highway crossing on the southern side of Cassino and the Richmond River.  I have a number of photos that I took over 10 years ago.  I know this as the photos show my car in some of photos that I took of the level crossing and that car has not been in the family for well over 10 years.  With these photos, and the help of Google Maps and driving over the level crossing in the Street View, you can look left and right.  It is a great help if you want to capture the scene correctly.  The only issue is I cannot get a 1985-1991 view of the level crossing through Google Street View.
 
On Wednesday night I started drawing up the scale drawing of the level crossing.  I then sourced the balsa that I was going to install at this Highway level crossing to simulate the roadway.
 
Looking west along the Bruxner Highway - some years back.

I even caught the southbound XPT.

The view looking east along the Bruxner Highway.

Later on Saturday afternoon before my mandatory game of cricket out the front, I cut the balsa I was to use for the roadway across the Bruxner Highway.  This was followed by staining the balsa. 
 
Today I fixed the balsa to the baseboard and will over the next few weeks work on the surrounding scenery.  I also mixed up another batch of plaster and went over some of the areas already plastered above.  I also put together what might end up being a bridge through truss bridge for just north of Lismore.
 
This shows the roadway in place.  I use thin styrene to represent the road lines.  This scene will develop over the next few weeks as more detail is added.
 
Yesterday I spend a few hours over my mate David’s place in the morning and early afternoon.  I powered up his layout (5 Amp NCE system) and noticed a short circuit in his recently re-wired yard.  That was not good.  As that was not my main reason to be there, I isolated this section of his yard and got on with work.   We connected up his Mini Panel into the cab bus and assigned address 63.  I then entered the code into the Mini Panel to control his main station from his yet to be built N-X panel (Entry-Exit Panel - You push two buttons in sequence and then the logic sets the valid route between those two points).  We identified what point motor cables from the 21 points in the station design had to go to what location in the four x DS64 devices that will power the points.  Some of these were connected up, with David to do the rest over the next few weeks.  David still has to connect all the DS64’s to the track bus and set the various addresses of the point motors and then we can test the point motors.  We still have to create 23 macros in the NCE command station to throw the various routes that are in the logic in the Mini Panel.  I am really looking forward to test this, and then demonstrate this concept to a few people.

Sunday, January 26, 2014

The B@$t@rds Drank me Dry

On Saturday afternoon I received a visit in the Shed from Anthony and Mark – two Victorian/South Australian Modellers.  They were last here on New Year’s Eve for another run.  We ran quite a few trains, with the occasional incident of a wagon coming off here and an uncoupling there, but generally it was fairly OK.  There were however, quite a few incidents of dirty track in a few locations.  I think that is a consequence of all the rain we had over the last week.
 
Yesterday's Running Session was only confirmed late on Friday afternoon and while I did send a call out to some of my regulars whom lived close by and a few from the other side of town, no one else could make it at such late notice.  Well I guess it was lucky that they didn’t turn up, as the two that were here drank me dry!  I thought I had a few more beers that what I had in the fridge, but it just means I need to buy some more - maybe tomorrow.
 
During the session, I also noticed a dip in the track on the entry into Murwillumbah where the banana siding branches from the main line and at least two trains had issues at that location.  So today I climbed under the layout and added some support under the baseboard at that location and I will see if that fixes the problems.  I also added a few supports directly under the main line into Murwillumbah just south of the platform.  These were lacking and there was always a major dip at the southern end of Murwillumbah platform.  So I think that was reduced by todays under baseboard work. 
 
I also noticed a slight dip in the track upon the southern entry into Clapham yard.  That will also be worked on maybe tomorrow.  There was also an issue, of the same Banana train over the last two running sessions within the hidden spiral between Old Cassino and Lismore.  This section of track allows for the train travelling between those two locations to take more than 15 seconds when travelling between the two locations.  With this bit of extra track in a spiral, the front of the train is not in one location while the rear of the train is not in the other location, as would be if I did not have the spiral in place.  What occurs now, the track, and hence the train is out of sight for most of the trip between these two locations.
 
I also had a visitor from the North Coast branch of the Tuesday Nighters on the Friday evening.  It had been a while since Peter had visited and  showed him what had he accomplished. Tuesday this week was also a Tuesday Nighter get-together and it was good to see everyone for the start of the new year.  I was another great night.
 
On Saturday morning in preparation of my visitors, in no particular order, I washed the coffee cups, swapped over the tea towels and completed wiring the power bus for Power District no. 3.  So now all the wiring on the layout should now be completed.
 
So my plans for the next few weeks is to do some more terra forming (plaster) work around the various tunnels and the spiral on the area north of Lismore towards Murwillumbah.  This afternoon after fixing the baseboard around Murwillumbah, I turned on the cricket and I resumed the plastering around the spiral.  I think I mixed up four batches of plaster and also did some work on the facia board around this location.
 
I intend to go back down to the shed tomorrow afternoon and continue with another 4 or more batches of plaster near the spiral, and do a facia install around the track on the southern side of Clapham Yard and also fix that slight dip in track at that location.
 
Happy Australia Day!  See ya next week.

Monday, January 20, 2014

Fourth Power District is Now Complete

Over the weekend I completed wiring up PowerBus for Block 4.  So I now have 4 of my power districts connected to their power bus.  I still have a single block to complete - Block 3.  I think that is my longest block section.  I hope to have this wiring complete this following long weekend.  Besides sitting under the layout and wiring droppers from the track to the power bus, I did get around to doing a few other things.

I have cut a facia panel for the Acacia Ridge Blob on the top deck.  That will protect trains coming down the gradient from Clapham Yard around the 220 degree bend into Acacia Ridge Yard.  It will also make this area look a bit cleaner, as it was just bare frame and baseboard.

I am also looking at building a small through truss bridge to go over the road crossing just north of Lismore.  This will be a scratch build based on a similar model I have next to the Richmond River bridge near Cassino and two more on the Upper Richmond River at Kyogle.  I have put all the styrene shapes aside and will look at gluing that together this weekend while I watch the Aussies belt the Poms again in the cricket.

I also got around to completed the testing of the point control in Loco Pilly from the control panel.  I have a 3 way point in the loco area and I had the point motors throwing in reverse order in some situation when I needed both of them to throw.  It was just tidier to fix that up.  You just need to get the first point motor out of the way before you throw the second point motor.  It is obvious when you look at it.  I did have one of my commands in the Mini Panel code wrong.  I was setting the point to Normal when it should have been set to Reverse in two locations in the code.  That was easily fixed.
 
On Monday last week I posted my NCE radio equipment away to get upgraded to the latest version.  Well on Thursday and Friday the kit was returned.  You could not get better service from Marcus Ammann than that!  Thanks Marcus.  While I was happy with the performance of the old version, you can really notice the difference with the new version.  I am most impressed.  I must admit that I am yet to experience one o fthose Loco run aways where the speed step is set to the maximum for the current loco on the Procab-R screen.  This is easily fixed, but was annoying.  Touch wood - it will happen never again.
 
So now I have three radio throttles in my arsenal.  My old Procab-R now has an internal antenna.  My old Cab04PR also has an internal antenna and has the latest version of the radio software.  My Powercab was also upgraded to radio and is fitted with an internal antenna with the latest version of software.  I think I am now really spoilt. 
 
For those thinking about doing this sort of similar upgrade, I would certainly recommend it.  I would also suggest that any person out there that has a Powercab for their home layout, and then takes this to the Club layout on the weekend to run there as a Procab, I would suggest that you find out if the your Club has radio installed.  If so, upgrade you Powercab throttle to a Procab-R when used at the clubhouse.  I'll be suggesting that my Running Session crew to look at upgrading their Powercabs to a Procab-R.  It certainly saves trying to find a plug in point on someone's layout.  Also you never loose control of your loco like you do when a plug-in throttle as you move from one plug-in point to another.

Sunday, January 19, 2014

I Have the Best Mates

I really do have the best set of mates out there.  They come in all sorts, young, old, short, tall, fat, skinny, beer drinkers, teetotallers, those with prototype knowledge, those good at modelling, those with hair and those without, those who steal trains, those that take the wrong branch on a running day and those that back the winning horse.  Some of my mates fall into many of the above categories.
 
I have to tell you a story about one of them who backed the winning horse!  He is the editor of our Great Club Magazine that goes right around the world in readership.  He photoshops me in weird hats, pink tutus and other things and generally just takes the p155.  Well he and a small team of Club members are also doing a great job in spicing up the Club N scale exhibition layout.  They have been doing a great job for some time now.  Anyway, the developers have come in and bought up the Golf Club on the layout and are converting it to a high profile and costly resort.  It will have a large ten lane swimming pool, tennis courts and basketball courts.  Last Saturday I was just amazed at what they were doing.  One thing was however troubling me.  The tennis courts that they were installing, to me anyway, looked to be Horribly Oversize.  It was not until Thursday at work this week that I caught up with this member, and asked the question that I thought that the Tennis Courts looked way to big and if anyone had doubled checked the size.  My question was prompted by watching the Australian Open on Wednesday night on TV and from side on getting a basic view of the tennis court with people on it.  I came to the conclusion that the court measurement from the base line to the service line was about 2 people lengths.  From the service line to the net looks about 2 and a half people lengths.  The model that I saw last weekend, when I mentally convert from N scale with N scale people, was way oversize and possibly Horribly Oversize. 
 
So when I spoke to this member about this, and he said, "No it was fine as 'HE' had checked and double checked and that the tennis court was indeed the correct size for N scale".  So on Friday morning, I thought I would Google "tennis court sizes" and convert the dimensions from metres 23.774 x 8.230 for a singles court and 23.774 x 10.973 for a doubles court, into N scale size by dividing by 160 and getting 14.9cm x 5.1cm and 14.9cm x 6.9cm.  When I sent this club member an email advising these dimensions, he was quick to reply, “Yeah Peter got it wrong!”  What a great mate.  Having his other mate’s back!  What a guy!
 
He is one of my bestest mates.  I just hope I don't get too many things wrong so he can have my back.