This post is Blog post number 900. This week I did some further work on the Cassino refreshment rooms building. I cut out the back platform side of the building. Oh and did I make some mistakes! I have plugged those up, and hopefully no one will ever know that they are on the building. So I have also seen my 3D window producer (Greg - at Saturday's Club meeting) and he was going to look at producing the windows for the building. I need 25. I really did not want to scratch build that many windows. I only had about 4 of the similar windows from the AMRI station building available. I'm not smart enough to do a loaves and fishes trick with those 4 windows. I also painted up the next 22 platform awning supports today. These were 3D printed by Greg some weeks ago, from a master that I created for him.
On Friday I painted up over 80 pallets in four different 'natural wood based' colour schemes. These look quite nice. While watching 'The Great Race' on TV today, I cut up and made another 54 pallets. These have yet to be painted, maybe a job for later this week. I will get around to making another 50-odd pallets next week.
After the race, I went down to the shed and ran my track cleaning train from Fisherman Islands to Grafton Yard and stabled it there. I needed to ensure that the track was sort of runable for Tuesday when the guys come over to my place. I also fixed one small section of fence that had been broken by someone.
Tomorrow a few of us are going train tripping out to Rosewood and then to Springfield for morning tea and lunch on our $0.50 fares.
Congrats on post 900 Craig! And enjoy those 50 cent train trips! I've made a few myself.
ReplyDelete